Link to project website: 5G-Crosshaul project
Contact: 5G-Crosshaul-Contact@5g-ppp.eu
Horizon 2020 – Call: |
H2020-ICT-2014-2 |
Topic: |
ICT-14-2014 |
Type of action: |
RIA |
Duration: |
30 Months |
Start date: |
1/7/2015 |
Project Title: |
5G-Crosshaul: The 5G Integrated fronthaul/backhaul transport network |
Mobile data traffic is forecasted to increase 11-fold between 2013 and 2018. 5G networks serving this mobile data tsunami will require fronthaul and backhaul solutions between the RAN and the packet core capable of dealing with this increased traffic load while fulfilling new stringent 5G service requirements in a cost-efficient manner.
The 5G-Crosshaul project aims at developing a 5G integrated backhaul and fronthaul transport network enabling a flexible and software-defined reconfiguration of all networking elements in a multi-tenant and service-oriented unified management environment. The Xhaul transport network envisioned will consist of high-capacity switches and heterogeneous transmission links (e.g., fibre or wireless optics, high-capacity copper, mmWave) interconnecting Remote Radio Heads, 5GPoAs (e.g., macro and small cells), cloud-processing units (mini data centres), and points-of-presence of the core networks of one or multiple service providers. This transport network will flexibly interconnect distributed 5G radio access and core network functions, hosted on in-network cloud nodes, through the implementation of: (i) a control infrastructure using a unified, abstract network model for control plane integration (Xhaul Control Infrastructure, XCI); (ii) a unified data plane encompassing innovative high-capacity transmission technologies and novel deterministic-latency switch architectures (Xhaul Packet Forwarding Element, XFE).
Demonstration and validation of the Xhaul technology components developed will be integrated into a software-defined flexible and reconfigurable 5G Test-bed in Berlin. Mobility-related Xhaul experiments will be performed using Taiwan’s highspeed trains. Xhaul KPI targets evaluated will include among others a 20% network capacity increase, latencies <1 ms and 30% TCO reduction.
The 5G-Crosshaul project addresses the ICT 14-2014 call of the Horizon 2020 Work Programme 2014-15 with a special focus on the P7 objectives as defined by the 5G-I-A.
UNIVERSIDAD CARLOS III DE MADRID | ES |
NEC EUROPE LTD | UK |
ERICSSON AB | SE |
ERICSSON TELECOMUNICAZIONI | IT |
ATOS SPAIN SA | ES |
NOKIA SOLUTIONS AND NETWORKS GMBH &CO KG | DE |
INTERDIGITAL EUROPE LTD | UK |
TELEFONICA INVESTIGACION Y DESARROLLO SA | ES |
TELECOM ITALIA SPA | IT |
ORANGE SA | FR |
VISIONA INGENIERIA DE PROYECTOS SL | ES |
E-BLINK | FR |
NEXTWORKS | IT |
CORE NETWORK DYNAMICS GMBH | DE |
TELNET REDES INTELIGENTES SA | ES |
FRAUNHOFER GESELLSCHAFT ZUR FORDERUNG DER ANGEWANDTEN FORSCHUNG EV | DE |
CENTRE TECNOLOGIC DE TELECOMUNICACIONS DE CATALUNYA | ES |
CREATE-NET (CENTER FOR RESEARCH AND TELECOMMUNICATION EXPERIMENTATION FOR NETWORKED COMMUNITIES) | IT |
POLITECNICO DI TORINO | IT |
LUNDS UNIVERSITET | SE |
INDUSTRIAL TECHNOLOGY RESEARCH INSTITUTE INCORPORATED | TW |
.