
Link to project website: https://www.eurescom.eu/archive/5G-VINNI/
Social media: https://twitter.com/5gVinni
Contact: 5G-VINNI-Contact@5g-ppp.eu
Horizon 2020 – Call: |
H2020-ICT-2017 |
Topic: |
ICT-17-2017 |
Type of action: |
R&I |
Duration: |
36 Months |
Start date: |
1/7/2018 |
Project Title: |
5G-VINNI: 5G Verticals INNovation Infrastructure |
Objective
5G-VINNI will accelerate the uptake of 5G in Europe by providing an end-to-end (E2E) facility that validates the performance of new 5G technologies by operating trials of advanced vertical sector services.
The 5G-VINNI strategy to achieve this involves:
- Design an advanced and accessible 5G end to end facility.
- Build several interworking sites of the 5G-VINNI end to end facility.
- Provide user friendly zero-touch orchestration, operations and management systems for the 5G-VINNI facility.
- Validate the 5G KPIs and support the execution of E2E trial of vertical use cases to prove the 5G-VINNI capabilities.
- Develop a viable business and ecosystem model to support the life of the 5G-VINNI facility during and beyond the span of the project.
- Demonstrate the value of 5G solutions to the 5G community particularly to relevant standards and open source communities with a view to securing widespread adoption of these solutions.
The 5G-VINNI E2E facility will demonstrate the achievement of 5G KPIs across a range of combinations and permutations of new 5G access technologies and end-user equipment types interconnected by the most advanced 5G core network technologies available. For this 5G-VINNI will leverage the latest 5G technologies, including results from previous 5G PPP projects.
This approach employs Network Function Virtualization, Network Slicing and a rigorous automated testing campaign to validate the 5G KPIs under various combinations of technologies and network loads. To ensure realistic load scenarios 5G-VINNI will create and make available an openness framework to give verticals and peer projects easy access to the 5G-VINNI facilities, both legally and technically, e.g. via open APIs. The 5G-VINNI facilities include 7 infrastructure instances in nationally supported 5G nodes across Europe; this number may be expanded as the ICT-19 projects come on-line in 2019.
Project Participants:
| TELENOR ASA | Norway |
| BRITISH TELECOMMUNICATIONS PLC | UK |
| TELEFONICA INVESTIGACION Y DESARROLLO SA | Spain |
| SAMSUNG ELECTRONICS (UK) LIMITED | UK |
| HUAWEI TECHNOLOGIES DUESSELDORF GMBH | Germany |
| HUAWEI TECHNOLOGIES NORWAY AS | Norway |
| ERICSSON AS | Norway |
| NOKIA SOLUTIONS AND NETWORKS OY | Finland |
| SOFTWARE RADIO SYSTEMS LIMITED | Ireland |
| LIME MICROSYSTEMS LTD | UK |
| EANTC AKTIENGESELLSCHAFT | Germany |
| KEYSIGHT TECHNOLOGIES DENMARK APS | Denmark |
| SIMULA RESEARCH LABORATORY AS | Norway |
| FRAUNHOFER GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V. |
Germany |
| EURESCOM – GMBH | Germany |
| ALTICE LABS SA | Portugal |
| PANEPISTIMIO PATRON | Greece |
| UNIVERSIDAD CARLOS III DE MADRID | Spain |
| ATHENS UNIVERSITY OF ECONOMICS AND BUSINESS – RESEARCH CENTER | Greece |
| INTRACOM SA TELECOM SOLUTIONS | Greece |
| SES TECHCOM SA | Luxembourg |
| CISCO NORWAY AS | Norway |
| ENGINEERING – INGEGNERIA INFORMATICA SPA | Italy |





